The company name has been anonymised; the focus is on how operations changed after the project.

Operations before the project

The company runs several projects at once, uses outsourced construction teams and signs high-value contracts.

Bottlenecks that led the business to Justeps

  • The project had many contractors and suppliers with inconsistent schedule and acceptance terms.
  • Land, environmental and construction procedures had not been sequenced.
  • Delay risk from site clearance had not been allocated in contracts.

Steps Justeps took with the business

  • Mapped the project's legal procedures by stage.
  • Drafted a consistent set of EPC, equipment supply and supervision consultancy contracts.
  • Designed risk allocation, extension and force majeure clauses.
  • Set up a contract obligations tracker and acceptance records.

How operations changed

  • Contracts aligned on schedule and responsibility.
  • Legal procedures followed the right sequence, reducing stoppages.
  • The owner had grounds to act when contractors were late.

Lesson learned: for Construction businesses, standardisation should start with the highest legal risks and then extend to the whole system so that operations are not disrupted.

Laws applied

  • Law on Construction No. 135/2025/QH15 (amended 2020)
  • Land Law No. 31/2024/QH15
  • Law on Environmental Protection No. 72/2020/QH14

Infrastructure projects. Learn about the service

If your business faces similar bottlenecks, send a request to info@justeps.vn or Hotline/Zalo +84 961 722 607.

Contact Justeps

📩 Email: info@justeps.vn

☎️ Hotline/Zalo: 096 172 2607

📍 Thanh Xuan office: 12th floor, Licogi 13 Tower, 164 Khuat Duy Tien, Thanh Xuan ward, Hanoi

📍 Ha Dong office: LK06B, No.10, Dong Dua area, Ha Dong ward, Hanoi

📍 Ho Chi Minh City branch: 528 Le Van Sy, Nhieu Loc ward, Ho Chi Minh City (formerly Ward 14, District 3)

📍 Hai Phong office: Truong Thinh hamlet, Ha Dong commune, Hai Phong

📍 Quang Ninh office: Van Don special zone, Quang Ninh